Buyer

Almond pricing starts with route identity

The same press can serve different almond businesses, so pricing only makes sense after kernel grade, oil endpoint, documentation level, and package format are named.

Send almond kernel status, culinary or cosmetic route, batch size, filtration target, tank plan, package format, and cake outlet before asking for pricing.

Route identity

Culinary, cosmetic, dual-use, or private label changes the whole quote.

Package format

Bottle, drum, or gift pack changes filling and packing scope.

Data list

Minimum almond data for a serious quote

  • Kernel: blanched, natural, broken, moisture, oil content, and intended market.
  • Route: culinary, cosmetic, dual-use, toll pressing, or private label.
  • Finish: crude oil, filtered oil, cosmetic drum, gourmet bottle, or gift pack.
  • Site: existing filters, tanks, filler, room size, voltage, and hygiene expectations.
Price risk

Missing data that changes almond equipment price

Cosmetic documentation

Traceability and retained samples add handling steps.

Gift packaging

Gift packs change filling speed, labeling, and packing tables.

Project boundary

What to confirm before scoping Almond Project Data Before Pricing

Almond Project Data Before Pricing should not be quoted from an equipment name alone. Check feed lots, target oil, post-press handling, and packing rhythm in one scope before deciding which Almond Oil Press modules stay. Factory cold-press page lists this oilseed — prioritize 355–500 (370–630 ton), pure press ~2 h/barrel.

When feed condition, moisture, impurities, batch weight, and product position are unclear, press tonnage and filter area become guesswork. Factory systems share 60 MPa and 2.2 kW motors; hot pure press is 30–40 min/barrel and cold pure press is ~2 h/barrel — cycle time matters more than brochure tonnage.

  • Confirm whether feed is whole seed, kernels, pretreated material, or an existing semi-finished stream.
  • Confirm whether the target is crude oil, filtered oil, bottled oil, drum ingredient oil, or a refining handoff.
  • Hot cycle reference: pure press 30-40 min/barrel, ~1.5 h for 2 barrels with loading; cold pure press ~2 h/barrel, ~4.5 h for 2 barrels.
  • Confirm batch rhythm, labor, changeover, retained samples, power (often 380V/50Hz/3ph), and site install conditions.
Factory model check

Match hot / cold models to factory hard data

When discussing Almond Project Data Before Pricing, pin models to published factory specs — not tonnage alone.

Hot 300/325: 300–325 ton, 60 MPa system, standard barrel Ø390×800 mm / max 100 kg, pure press 30–40 min/barrel, ~1.5 h for 2 barrels with loading, 2.2 kW motor. Cold 355/400/426/480/500: 370–630 ton, integrated frame, same 100 kg standard barrel, pure press ~2 h/barrel, ~4.5 h for 2 barrels with loading; optional Ø300 high-pressure barrel max 60 kg. Residual oil target ~≤5% (peanut hot often 6–8% measured).

60 MPa
System pressure
High-low dual pump, ~60 MPa continuous
2.2 kW
Motor power
380V / 50Hz / 3 phase
300/325
Hot series
Pure press 30–40 min/barrel · ~1.5 h for 2 barrels
355–500
Cold series
370–630 ton · pure press ~2 h/barrel · ~4.5 h for 2 barrels
  • Standard barrel Ø390×800 mm, max ~100 kg crushed feed; optional Ø300 high-pressure barrel max ~60 kg.
  • Cylinder material 27SiMn; cold frames are integrated molded steel; hot frames are typically H-type channel steel.
  • Factory cold-press page lists this oilseed — prioritize 355–500 (370–630 ton), pure press ~2 h/barrel.
Equipment check

Buyer needs to land in equipment interfaces

After Almond Project Data Before Pricing is clear, write the interfaces: how preparation feeds the press, how oil leaves the press, how filtration connects to tanks, and how packing receives finished oil.

Front-end input

Record feed form, daily volume, moisture, and sorting needs so pretreatment is not left to operators.

Filtration grade and compliance packs

Culinary 1–5 μm; cosmetic may need 0.22 μm sterile. Defatted almond flour from cake should share food-grade hygiene planning.

Delivery data

Prepare space, power (often 380V/50Hz/3ph), labor, target package, local rules, and acceptance method before quotation.

Send this page's requirement to the factory

Bring kernel condition, target output, and site constraints, and we will continue from what this page covers.